![]() An ideal operation time to proses a part was used as the annealling schedule.įrom the empirical test, it could be proved that the use of ABC approach and Simulated Annealing to search the route (routing process) can optimize the Total Production Cost. The search method that was used in this experiment is Simulated Annealling, a variant form Hill Climbing Search method. In this reasearch, Activity-Based Costing(ABC) approach was used as the weight to search the operation route in the proper machine, so that the total production cost can be optimized. FMS combine the high productivity and flexibility of Transfer Line and Job Shop manufacturing system. ![]() ACTIVITY-BASED COSTING DAN SIMULATED ANNEALING UNTUK PENCARIAN RUTE PADA FLEXIBLE MANUFACTURING SYSTEMSįlexible Manufacturing System (FMS) is a manufacturing system that is formed from several Numerical Controlled Machines combine with material handling system, so that different jobs can be worked by different machines sequences. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |